FEATURES
- Maximum 66kVA Standby, 400V, 1500 RPM
- 400 litre tank : 32 Hours runtime @ 75% load
- Built-in AVR delivers non fluctuating power
- 12V Electric Starter
- 4 cylinder, 4-stroke Powerful Diesel Engine
- Three Phase Output
- 60kVA Prime Silent Diesel Generator
PERFORMANCE
Prime power (PRP) | 60 kVA |
Standby power (LTP) | 66 kVA |
Power factor | 0.8 φ |
Frequency | 50 Hz |
Voltage | 400 V |
GENERAL ENGINE DATA
Engine brand | John Deere |
Engine model | CD4045TF158 |
Engine Type | 4 cylinder, 4-stroke |
Air intake type | Turbo Charged |
Cooling mode | Water cooling |
Governor mode | Mechanical |
Rated speed(rpm) | 1500 |
Displacement(L) | 4.5 |
Starter Motor | 12V |
Description | Diesel Generator |
BATTERY DATA
Brand | |
Voltage | 12V |
Quantity | 1 |
GENERAL DATA
Controller Brand | DeepSea |
Controller Model | DSE7320 |
Structure Type | Silent |
Noise Level (dBA @ 7m) | 72 |
AVR | Constant voltage AVR |
Excitation Mode | Self Excitation |
Fuel Type | Diesel |
Recommended Oil | L-ECD grade or 15W40 |
ISO9001 Certified | Yes |
ALTERNATOR DATA
Alternator Brand | Leroy Somer |
Alternator Model | LSAP 42.3K |
Rated Current (A) | 86 Amps Per Phase |
Pole Number | 4 |
Phase Number | Three Phase |
DIMENSIONS & TANK
Length | 2800 mm |
Width | 984 mm |
Height | 1631 mm |
Tank Capacity | 400 l |
Cons. @ 50% Load | 8.5 l/h |
Cons. @ 75% Load | 12.5 l/h |
Cons. @ 100% Load | 16 l/h |
RECOMMENDED ATS (AUTO SWITCH)
STANDARD FEATURES
Pre-Delivery Testing Filled with oil and coolant, tested under full load. |
YES |
Pre-Delivery Inspection (PDI) Full inspection of the generator |
YES |
User Manuals | Books supplied & Digital (Online) |
24 Hour Telephonic Support | YES |
FAQ
Does the price include installation?
No, the price doesn't include installation. Installations are all different and require varying length of cable, time and distances to be travelled. In addition to this installations need to be done by a qualified electrician to issue a valid Certificate of Compliance (COC) for your insurance. We will gladly recommend a qualified local installer, please ask your Sales Consultant for more information.
Do we offer installation?
No, but we do have recommended installers throughout Southern Africa who will be able to assist you with your installation and sizing your generator.
Does the price include delivery?
All prices exclude delivery. Due to the nature of the goods and their size they have to be delivered by a specialised truck and rigging crew. Hence delivery is charged extra based on the distance and complexity of the delivery.
Do I need anything else to connect the generator?
Yes, you'll need either an Automatic Transfer Switch (ATS) or Manual change over switch in order to link the generator into your property's electrical distribution board. This is required by law to ensure that the generator and mains supply are adequately isolated from one another.
What size ATS do I need?
The recommended size ATS is based on the size of the generator, not the mains incoming supply. The ATS should be capable of taking the whole load from either mains or the generator as both will pass through the ATS switch. Therefore, whilst the recommended switch size will be correct for most installations, it may not be correct for your installation. You should ensure that an electrician performs a load test and checks this information.
Tell me about the Warranty?
The warranty is 12 Months or 1000 Hours whichever occurs first. It is a limited warranty. Travel to site is not included in the warranty. The goods need to be returned to us or a call out will be charged. Please refer to the Terms and Conditions of sale and the Warranty Card for further information on the warranty. Warranty is held with the agency where you bought the generator. If you have purchased your generator in Johannesburg then the warranty is held in Johannesburg etc.
Price Validity
Pricing is valid whilst stock lasts and is subject to change without prior notice. Pricing on the website is indicative and should always be confirmed by Bundu Power in the form of a written quotation.
The generator will not be able to take the full load instantaneously. The load should be added to the generator gradually. 50% initially and then stepped up over time once engine is up to temperature.